Industrial Sector Projects
We have completed a large range of Industrial sector projects since the company’s inception, working with some of Ireland’s leading employers and industry leaders. As cost managers, CuddyQS have provided valuable assistance in ensuring these projects have been completed on time and within budget. Please view a small sample of our industrial sector projects below and call us today if we can be of any assistance.

E.I Electronics Office & Production Building
Project: The project involves the demolition of an existing service yard and carparking area in order to facilitate the construction of a two-storey extension to the existing production facility, along with office, entrance foyer and R&D areas constructed over 3 levels.
Client: E.I Electronics
Value: Confidential
Size: 10,000m2
Stage/Date: Completed 2021
Architect: O’Neill O’Malley

Warehouse Extension to Bay Q, Raheen, Limerick
Project: The project involves the proposed construction of a new warehouse building of circa 30,000ft2, new loading docks and all associated siteworks on a 1.126 hectare site, located at Bay Q, Ballycummin Avenue, Raheen Business Park, Raheen, Co Limerick. The existing property comprises of a warehouse section with parapet of block cavity wall construction. The warehouse roof panels are supported on steel trusses and internal concrete columns with concrete floors throughout.
The warehouse is served with a loading bay to an existing enclosed concrete yard. The office sections are built in a block cavity wall with brick façades and parapets formed in metal cladding. Concrete floors with metal stud partitions and suspended ceiling throughout the office areas.
Client: Eastway Logistics
Stage/Date: On Site

Future Mobility Campus Ireland (FMCI)
Project: Future Mobility Campus Ireland (FMCI) was founded with the sole purpose of creating and delivering future mobility testbed facilities for stimulating research, development and innovation in the area of Autonomous Connected Electric Shared Vehicles (ACES), including Connected and Autonomous Vehicles (CAV) in Ireland. The testbed will be located in the Limerick-Shannon metropolitan area at Shannon Free Zone, Shannon, Co.Clare.
Client: FMCI
Stage/Date: On Site
Architect: Hassett Leydon

GE Sensing (Baker Hughes)
Project: Provision of Office Space & Warehouse Extension to existing facility over 2 phases.
Client: GE Sensing
Value: €6M
Size: 6,800 m2
Stage/Date: Completed
Architect: Hassett Leydon

Edward Life Sciences, Shannon
Project: Swing Site for FDI including 1600 m2 cleanroom, office space and welcome facility.
Client: Edward Life Sciences
Value: Confidential
Size: 2,600m2
Stage/Date: Completed 2018
Architect: O’Neill O’Malley

Baxter Healthcare
Project: Provision of Clean Room & Process Spaces within existing facility.
Client: Baxter Healthcare
Value: Confidential
Size: Confidential
Stage/Date: Completed 2020
Engineers: Dolmen Engineering

Grant Engineering
Project: Provision of R&D facility including showroom at corporate HQ.
Client: Grant Engineering
Value: €4.2M
Size: 1,351m2
Stage/Date: Completed November 2019
Architect: Derek Coulter Architects

Warehouse and Logistic Centre for DHL Logistics
Project: Warehouse and Logistic Centre for DHL Logistics incl. PUD Systems
Client: Rocktwist Holdings
Value: €3M
Size: 2160m2
Stage/Date: Completed 2018
Architect: Lynch & Associates

Takumi Precision Engineering, Limerick
Project: High Industrial Manufacturing Space with Office Space.
Client: Takumi Precision
Value: €3.8M
Size: 2,800m2
Stage/Date: Completed Phase 1 – 2008 | Phase 2 – 2012 | Phase 3 – 2017
Architect: Cronin Sutton Cotter

E.I Electronics (Phase 1)
Project: Complete upgrade and refurbishment of E.I HQ. Including; offices, silos, manufacturing and distribution spaces
Client: E.I Electronics
Value: €7.7M
Size: 12,000m2
Stage/Date: Completed 2016
Architect: Noel Kerley Associates

Vortex Aviation, Shannon
Project: Refurbishment of two units.
Client: Vortex Aviation
Value: €2.4M
Size: 3,000m2
Stage/Date: Completed 2014
Engineers: Garland Engineers

Kiernan Milling, Granard, Co.Longford
Project: Construction of New Milling Facility.
Client: Kiernan Milling
Value: €14M
Stage/Date: Completed 2020
Architect: MCB Ltd
